...

Home / Sectors / Construction and infrastructure

Sector

Lighting for construction and infrastructure

A construction project relocates itself. What is in the right place today will be in the wrong place in six weeks, and the surrounding area is watching the entire time. We supply lighting calculated per phase, that can move to the next project, and stays within the property boundary, for contractors in construction, infrastructure, and civil engineering.

3 to 5

projects per luminaire, without a single complaint from the neighborhood

Per phase

recalculated and recalculated at each phase transition

Mains, battery, or diesel

the power supply dictates the design, even with grid congestion

Drone photo of the tower crane lighting at HSB in Hilversum at night

HSB Hilversum: the entire work area illuminated from the crane jib, the surrounding neighborhood remains dark

This is what it looks like for you

What we encounter with contractors

what we encounterwhat did it cost youwhat it is about
Lighting is only adjusted when the first night shift startsWork lights on tripods that no one has calculated, and no document when asked forplanning and calculation per phase
The connection is not there or too small, so the generator is running continuously.Diesel, noise, and friction with the local community at the worst possible timepower supply and battery setup
The local resident is calling the municipality and not youA clue you cannot do anything with while workingenvironmental zone and shielding
Every phase transition shifts the setupSomeone moves the masts by intuition and afterwards nothing is right anymoreheight and bundle per phase
Equipment goes to the next project after this one, the lighting often does notPaying twice for the same workreusing across projects
What determines the design here

Seven factors that drive a building design

Design factorWhat is going on hereWhat determines it in the design
TemporarinessThe setup changes per construction phase, lasting from weeks to months in the same locationMovable masts, quick setup and takedown, recalculation at each phase transition
Catering on the construction siteA generator or construction site power connection, voltage dips when heavy equipment starts up, and, increasingly, a battery because grid congestion means there is no connection available or the one available is too smallDriver voltage range, protection, distribution across groups, and power consumption per operating hour. For battery systems, we also supply the fixtures in a DC version, eliminating the need for an inverter and the associated losses.
Blinding to the outsideRoadside, railway, or residential area construction work, subject to permit conditions and resident complaintsShielding and direction, environmental zones E0 through E4 with the limit values from Table 4 of EN 12464-2:2024 and CIE 150, supplemented at the national level by the NSVV Light Pollution Guideline 2020, plus a threshold value increase of no more than 15 percent toward the road
Mechanical stressDust, impacts, transport between locations, and risk of theftIP and IK rating, mounting, anchoring and locking
Height that grows with youThe work surface rises or falls with the work, but the light point height does not automaticallyMast height per phase, bundle width, number of erection points
Dark monthsThe peak is between October and March, in two or three shiftsEstimation of operating hours, energy costs, and generator fuel consumption, and consequently the payback period
Wind load on temporary mastsFreestanding masts with limited anchoring on an open siteFlooded area, ballast, and anchoring; height in relation to wind loads

The guideline values per activity, ranging from 20 lux for earthwork to 300 lux for installation work, are not on this page but on the page concerning that topic. That page also explains why the modified value from the standard almost always applies on a construction site rather than the minimum value.

Clients
This is how a process works

From initial phase to delivery

STEP 1

Recording and lighting calculation per phase

STEP 2

Choice between buying, renting, and taking along

STEP 3

Delivery from Nijkerk

STEP 4

Recalculation at phase transition

STEP 5

Maintenance, warranty, and reuse on the next project

Questions from this sector

What contractors ask us

The 2AXL light mast is available for rent, while the Sentinel Tower and individual fixtures are available for purchase. Fixtures on your own mast or equipment move with you to the next project.

Standard versions come from Nijkerk and are fast; project configurations upon consultation.

Five years complete.

Yes, every setup is calculated in DIALux and tested against the standard.

We provide design, fixtures and supervision; the work itself is done by your own team or your installer.

Submit your situation

Submit your project

Send us the nature of the project, the phase you are in, and what is adjacent to it. You will receive a lighting calculation with the guideline values per zone and a layout that you can discuss.

Response within 1 working day, by an engineer
Lighting calculation free of charge, per zone
Test luminaire on your own mast, upon request
Warranty 5 years complete, 10 years on the housing with maintenance contract

Rather call directly: 033 785 9809

We respond within one working day. We deliver standard items within a week. Custom work, such as a different light colour, a different CRI or a bespoke version, by arrangement.