High-mast retrofit for the P&O Ferries terminal in Europoort

JEL replaced failing sports lighting with 119 DarkLicht luminaires mounted on 30 new pole structures,more efficient, casting fewer shadows, and completed in just two weeks.

Client

Logo of P&O Ferries Europoort
Top view of the illuminated P&O Ferries terminal at night

119

luminaires

66,3%

energy saving

Europoort,

Netherlands

30 lampposts

26 m from

In 2 weeks

delivered

PROJECT CONTEXT

Replacing failing sports lighting with port-resistant lighting

P&O Ferries had already converted the terminal in Europoort to LED lighting in 2021, using a well-known A-brand from the sports lighting market. In practice, it turned out that those luminaires were not made for the demanding conditions of a haven terminal.

Just because a luminaire proves itself in one branch doesn't mean it will work in a different environment. To help P&O out of a bind, JEL designed and delivered a new, port-adapted lighting installation.

THE CHALLENGE

Efficient and low-shadow design at an operational terminal

The new installation had to be designed based on an existing site layout, where not only the lighting was renewed, but mast supports and structural maintenance were also required. The biggest challenge was a design that was as efficient as possible, complied with NEN-EN 12464-2:2024, and simultaneously minimized shadow casting.

This required extra care during execution: the terminal is in constant motion, and ferry passengers unfamiliar with the area are also present. Therefore, good precautionary measures and timely coordination with the Port Duty Managers were essential.

CURRENT SITUATION

From a failed retrofit to a port-tuned solution

The previous LED retrofit with sport luminaires did not meet expectations at the port. Instead of installing individual luminaires again, JEL took a comprehensive approach: a new lighting design, new pole structures, and an installation tailored to the realities of a ferry terminal.

Highly focused DarkLicht luminaires provided more light on the grounds, using significantly less power than the previously installed lighting.

Project card

Project Type

Harbor terminal, retrofit of existing LED lighting (high mast)

Location

Europoort, Netherlands

Client

P&O Ferries

Environment

A ferry terminal in continuous operation with passenger traffic, located in a coastal setting

Current situation

Previous LED retrofit with sports fixtures fell short in the port

Scope

Lighting design and engineering, new mast constructions, DarkLicht fixtures, installation and maintenance

Result

42 lux with 0.40 to 0.55 uniformity; approximately 66% energy savings; delivered in 2 weeks

Standards

NEN-EN 12464-2:2024 and NEN 1010

Discuss a similar project

Prefer direct contact? +31 33 785 9809

P&O Ferries terminal lit up at night, seen from above
Our engineering-first approach

First the environment, then the system, then the product

JEL designed the lighting concept based on the actual situation at the terminal: an existing site layout, fixed mast positions, strict requirements for uniformity and shadow, and a site that is continuously in operation.

By first determining that situation and the light distribution and only then choosing the luminaire, an efficient installation was created that complies with NEN-EN 12464-2:2024. The electrical installation has been carried out in accordance with NEN 1010.

NEN-EN 12464-2:2024NEN 1010

Step 1

The environment

What is happening at the location determines the design: height, operating hours, environment, standards.

Step 2

The system

Light distribution, uniformity and glare are calculated before a luminaire is chosen.

Step 3

The product

Only after that follows the choice of luminaire, optics, and mounting that matches that calculation.

Scope of JEL Products

From lighting design and mast construction to installation and maintenance

JEL provided the complete retrofit for the P&O terminal in Europoort: from lighting design and engineering to new mast structures, DarkLicht luminaires, installation and maintenance.

Color-coded lighting design for the P&O Ferries terminal Europoort

Efficient lighting design

JEL designed the lighting as efficiently as possible within NEN-EN 12464-2:2024, using sharply focused fixtures that bring more light to the site and limit spill light.

Top view of the P&O Ferries terminal at night with trailers

Shadow reduction

Based on the existing terrain layout, the lighting design was developed to minimize shadowing, despite the fixed mast positions.

Drone inspection of a light pole after a retrofit project at P&O

New mast constructions

In addition to the lighting, the project also requested new pole supports and structural maintenance. JEL supplied and installed the new pole structures for the 30 light poles.

Installation of area lighting at the P&O Ferries terminal Europoort at night

Safe work on a ferry terminal

The terminal is constantly in motion, with a lot of passengers who are not familiar with the area. Careful precautions and coordination with the Port Duty Managers allowed for safe and uninterrupted work.

Installation work at the P&O Ferries Terminal Europoort

Up to 66% in energy savings

Thanks to improved light distribution, reduced light pollution, and newer technology, the system saves approximately 66.3% compared to the previously installed LED lighting.

Installation of area lighting at the P&O Ferries terminal with ferry

Delivered in two weeks

The entire project, including new mast constructions, was completed in just two weeks on a continuously operational terminal.

Solution and result

More light, significantly lower energy consumption, completed in two weeks

The system provides 42 lux at the terminal with a uniformity between 0.40 and 0.55. At a few locations, a decision was made to provide more light in accordance with modifier 5.3.3 of the standard, where 30 lux is normally the requirement.

Compared to the previously installed LED lighting, this solution delivers energy savings of approximately 66.3%. The entire project was fully completed in just two weeks.

42 lux with 0.40 to 0.55 uniformity

Around 66% energy saving

Delivered in 2 weeks

Used product

Product rendering of the DarkLicht DL1 EXT full-cut-off floodlight

119 DarkLicht DL1 luminaires on 30 light poles

The terminal is equipped with 119 DarkLicht DL1 Luminaires, distributed across 30 light poles, each 26 meters high. The DarkLicht was chosen for its sharp, focused light distribution, which keeps the light on the site and minimizes light spill.

It was precisely that better bundling that made the difference compared to the previously installed sports luminaires: more usable light on the terminal, with less power.

Project-related questions

What clients ask about this project

The terminal was already equipped with LED lighting in 2021 from a well-known A-brand in the sports lighting market. Those luminaires were not designed for the demanding conditions of a port terminal. Just because a luminaire proves itself in one industry doesn't mean it will work in another environment.

JEL designed a new lighting system tailored to the port, featuring DarkLicht luminaires that focus the light into a narrow beam. As a result, more light reaches the site and less is lost to light pollution, while using significantly less power.

Compared to the previously installed LED lighting, this solution saves approximately 66.3%, thanks to better beam focus, less stray light, and newer technology.

The terminal is in constant motion, and there are also passengers who are unfamiliar with the area. With careful precautions and timely coordination with the Port Duty Managers, the work could be carried out safely and without disruption.

The entire project, including new mast constructions, was completely delivered in just two weeks.

Request

Discuss a similar project with us

Are you working on a port terminal lighting project, a retrofit, or another demanding outdoor environment? JEL supports the entire process: from lighting design and engineering to mast structures, lighting fixtures, installation, and maintenance.

Response within 1 working day, by an engineer
Lighting calculation free of charge, per zone
Test luminaire on your own mast, upon request
Warranty 5 years complete, 10 years on the housing with maintenance contract

Rather call directly: 033 785 9809

We respond within one working day. We deliver standard items within a week. Custom work, such as a different light colour, a different CRI or a bespoke version, by arrangement.